APU and Ballistic Control Propellant Feed Systems

Parent Previous Next

Two completely independent feed systems provide propellant for the auxiliary power units and the ballistic control system.


Note: Ballistic control is not supported in this software version. Refer to "Ballistic Control System".


System 1 is in the left side of the fuselage; system 2 is in the right side of the fuselage. The two systems are identical.


Helium gas under pressure moves the monopropellant hydrogen peroxide to its basic function of providing fuel to these units at the required flow rates and pressures. Each propellant feed system includes a high-pressure, spherical, helium storage tank and a positive expulsion-type hydrogen peroxide storage tank. Both tanks are below the related auxiliary power unit in the forward fuselage.


Helium and hydrogen peroxide filler valves and helium high-pressure gages for ground servicing are in each side of the fuselage side fairings. Helium and hydrogen peroxide pressure gages common to both systems are in the cockpit.


When the ballistic control switch [18 or 27, fig. 5-1] is turned ON, or when the APU switch [17 or 30, fig. 5-1] is turned ON (or to JETT), a shutoff valve is opened to allow helium to flow from the storage tank. The helium tank contains enough helium to expel all the hydrogen peroxide in the hydrogen peroxide storage tank. Helium pressure is reduced from 3600 psi at the tank to 550 psi as it passes through a pressure regulator. A relief valve upstream of the pressure regulator prevents overpressurization due to overcharging or pressure build-up during high-temperature conditions. From the pressure regulator, the helium passes through the shutoff valve and pressurizes the hydrogen peroxide tank.


The positive-expulsion type hydrogen peroxide tank contains a baffle cylinder, perforated to allow the propellant to flow to a pickup tube inside the baffle cylinder. The inlet of the pickup tube is very close to the bottom of the tank to prevent it from being uncovered during normal flight attitudes when only approximately 20 percent of the propellant supply remains in the tank.


Between the baffle cylinder and tank wall is a collapsible plastic bladder. The helium enters the tank between the wall and the bladder where pressure on the bladder forces the hydrogen peroxide into the baffle cylinder through the pickup tube and out of the tank. A check valve upstream of the tank prevents hydrogen peroxide from backing into the helium system in case of a bladder failure. When the tank is emptied to the extent that the bladder collapses against the baffle cylinder, the feed pressure will drop off. This pressure drop creates a pressure differential between the helium and hydrogen peroxide. When this pressure differential increases to approximately 35 psi, a differential pressure switch in the system actuates a low-level caution light [31, fig. 5-1] in the cockpit.


Pressure differential is also sensed by a valve that opens at approximately 55 psi and allows helium to flow to the top of the baffle cylinder, expelling the remaining hydrogen peroxide.


Protection of the hydrogen peroxide tank against rupture due to overpressurization is provided by a pressure relief valve and a blowout plug. The relief valve is designed to open at approximately 650 psi (100 psi over normal tank pressure). In case of a malfunction of the pressure relief valve or an abnormal rate of pressure increase, the blowout plug will rupture at approximately 900 psi. If the blowout plug should rupture, the affected system will be deactivated by loss of the propellant through the plug. The flow of both of these relief devices is routed overboard through a vent and jettison line [6, fig. 3-2].


A thermoswitch at the base of the tank energizes a warning light [28, fig. 5-1] in the cockpit if the hydrogen peroxide in the tank becomes overheated. From the storage tank, the propellant is routed into feed lines through shutoff valves to the auxiliary power unit and the ballistic control system. Temperature of the propellant at the APU inlet must be a minimum of 40° F during starting. To prevent freezing in the feed lines, warm air from the carrier airplane is pumped into the compartment containing the propellant feed system hydrogen peroxide components to maintain a temperature of approximately 120° F. The system is designed to dump helium and hydrogen peroxide overboard if an emergency arises.


Note: The remaining quantity of APU hydrogen peroxide can be monitored on the system monitor panel.



In this section:


APU and Ballistic Control Propellant Feed System Controls and Indicators